Mar. 1, 2017 - Down 10.5" from Full
Feb. 1, 2017 - Down 14.5" from Full
Jan. 1, 2017 - Down 20.0" from Full
Dec. 1, 2016 - Down 24.0" from Full
Nov. 1, 2016 - Down 24.0" from Full
Oct. 1, 2016 - Down 21.8" from Full
Sep. 1, 2016 - Down 14.3" from Full
Aug. 1, 2016 - Down 8.4" from Full
Jul. 1, 2016 - Down 5.0" from Full
Jun. 1, 2016 - Down 2.5" from Full
May 1, 2016 - Down 2.8" from Full
Apr. 1, 2016 - Down 3.5" from Full
Mar. 18, 2016 - ICE OUT!!!
Mar. 1, 2016 - Down 4" from Full
Feb. 1, 2016 - Down 13.5" from Full
Jan. 1, 2016 - Down 5.8" from Full


Full Lake Level is 504.32 ft above sea level

Links and Forms

Click here to link to the NH DES Wetlands Forms Page

OUR CONTRACTOR PARTNERS:

We are proud to have worked with the following fine area contractors on the marine portions of these projects - Please note that our expertise is the "wet" portions of these projects including; permitting, foundations and pile driving, dock construction, boatlifts, dredging, etc. and that typically our contractor and/or architect partners are responsible for the structures above:


Dug-In BoathouseDug-In Boathouse


 Our Partner:  Wood & Clay Fine Homes
Architect:  Battle Associates

(permit application - construction consulting – boatlifts – seasonal services)



Breakwater and DockageBreakwater and Dockage


 Our Partner:  Skiffington Homes
(permit consulting – constuction services – rock breakwater – pile driving – boat lift )



Boathouse Foundation ReconstructionBoathouse Foundation Reconstruction


 Our Partner:  Vittum Contracting
(permit application - full crib reconstruction – dock framing)


Dug In BoathouseDug In Boathouse

Our Partner:  White House Construction
(permit/design consulting - dredging – excavation & foundation – boatlifts)


Sunapee Timber Framed BoathouseSunapee Timber Framed Boathouse


 Our Partner:  Vermont Timber Works
(permit application - construction services – full crib replacement – dock construction – boatlift)


Lake Sunapee Boathouse RebuildLake Sunapee Boathouse Rebuild

                                                          Our Partner:  McGray & Nichols
                                                          Architect:  Sheerr & White
                                                  (design modifications, permit application, demolition, crib reconstruction, dock framing)